Back Up and Define Rollback Before You Touch Production

The safest time to decide how to recover is before the change has modified the evidence you depend on.

Current. Current engineering note based on recent hserver deployment, debugging, recovery, and production-hardening work in September 2026.

This is reversible change design and change-window discipline. Google SRE postmortem data shows configuration and binary pushes are major outage triggers, so deployment planning is itself a reliability control. Recent hserver deployments routinely touched stateful databases, trust material, authentication configuration and container definitions. Starting the edit first and inventing rollback later would make recovery depend on whatever state survived the failed change.

Change planning is often biased toward the success path. Failure-path inputs—backup, previous revision, config copy and restore order—must exist before the mutation begins.

Runbooks require preflight inventory, relevant backup, exact Git revision and a known rollback target before deployment, followed by health verification and documentation. Refuse high-risk changes when rollback inputs are missing. A change that cannot be reversed should be explicitly classified and receive stronger review. The concrete hserver evidence is commit fa3c478, so this note is tied to an actual production change rather than a hypothetical failure.